05.11.2018

A new production hall is ready

Only 6 months after obtaining all necessary permits, the WAGAT company set and equipped our new production hall in Wilków. The hall was officially opened on October 31 this year. Built according to the traditional modular system, the investment has an area of 1150m2 and is equipped with two gantries - one with a lifting capacity of 20T and the other with a lifting capacity of 5T. It uses energy-saving and environmentally friendly technologies such as gas heating, recuperator or LED lighting. The space obtained thanks to the construction of a new hall will be used for the assembly of drilling and bolting rigs.